Tara Hills Full Trash Capture
The work to be done generally consists of installing prefabricated Trash Treatment Control Devices (TTCD) at three locations in the Tara Hills area. Work includes temporary water diversion and dewatering, roadway and structure excavation, temporary shoring, installation of TTCD units, reconstruction of sidewalk and roadway, and replacing roadway striping.
Plan Holders
Date | Company | Contact |
4/15/22 9:43 am |
Con-Quest Contractors Inc.
290 Toland San Francisco, CA 94124 |
Gabrielle Ramos
Office Manager
Tel: 4152060524
Fax: 4152060528
|
4/1/22 9:49 am |
Construction Bidboard, Inc.
11622 El Camino Real # 100 San Diego, CA |
000 Plan Room
Tel: 800-479-5314
|
4/4/22 1:53 am |
Dodge Data & Analytics
2860 S State Hwy 161 Ste 160 #501 Grand Prairie, TX 75052 |
Jayalakshmi L
Other
Tel: 413-376-7032
Fax: 609-336-2767
|
4/1/22 9:49 am |
Dodge Data and Analytics
2860 S State Highway 161 Suite 501 Grand Prairie, TX 75052 |
000 Plan Room
Tel: 413-304-2008
Fax: 306-336-2767
|
4/4/22 3:27 pm |
Kerex Engineering Inc.
93 Monte Cresta Ave. Pleasant Hill, CA 96523 |
Hector Barajas
Project Engineer
Tel: 9253878913
Fax: 9253870853
|
4/5/22 8:25 am |
McGuire and Hester
2810 Harbor Bay Parkway Alameda, CA 94502 |
Mabel Cater
Estimating Administrative Manager
Tel: 510 632-7676
Fax: 510 562-5209
|
4/17/22 6:00 pm |
SubTerra Construction, Inc.
1350 Van Dyke Ave, Ste 101 San Francisco, CA 94124 |
Kevin Fitzpatrick
Tel: 4155001685
|
4/22/22 9:44 am |
W. R. Forde Associates, Inc.
984 Hensley Street Richmond, CA 94801 |
David Voorhis
Chief Estimator
Tel: 5102159338
Fax: 5102159867
|