San Pablo Dam Road and Bailey Road Signal Hardware Upgrades Project
General work description: The work to be done generally consists of upgrading traffic signal hardware, installing Advanced Dilemma Detection Zone using video/radar signal detection systems, and improving pedestrian crossing signal hardware at 9 intersections on San Pablo Dam Road between El Portal Drive and Castro Ranch Road in the El Sobrante area, and 2 intersections on Bailey Road between Canal Road and Willow Pass Road in Bay Point.
GFE
(click to expand/collapse)
Name | Size | |||
CCC_GFE_4139 | 1.3 MB |
Proposal & Contract
(click to expand/collapse)
Name | Size | ||
CCC_PC_4139 | 830.3 KB |
Special Provisions
(click to expand/collapse)
Name | Size | ||
CCC_SP_4139 | 2.7 MB |