Walnut Boulevard Bikeway Gap Closure Project
General work description: The work to be done generally consists of roadway shoulder widening along an 860-foot segment of Walnut Boulevard between Marsh Creek Road and Vasco Road to provide Class II Bike lanes in the unincorporated Brentwood area. Additional improvements include grinding and overlaying the roadway pavement section, and installing a centerline rumble strip, striping, pavement markings, and signage.
Bid Documents
(click to expand/collapse)

Name | Size | ||
CCC_PC_4118 | 721.5 KB | ||
CCC_SP_4118 | 1.9 MB |
GFE
(click to expand/collapse)

Name | Size | |||
CCC_GFE_4118 | 1.3 MB |