Bay Point Trash Capture Installation Project
General work description: The work to be done generally consists of installing a prefabricated Debris Separating Baffle Box (DSBB) on Willow Pass Road at Alves Lane in the Bay Point area. Work includes temporary water diversion and dewatering, roadway and structure excavation, temporary shoring, installation of DSBB unit and manhole, reconstruction of roadway and slurry seal, and replacing roadway striping.
Bid Documents
(click to expand/collapse)
Name | Size | ||
CCC_PC_7079 | 811.8 KB | ||
CCC_SP_7079 | 17.5 MB |