Basket Removal with CPS Replacement & Trash Capture Augmentation Project

General work description: The work to be done generally consists of removing 94 existing trash capture basket and crescent type devices and 9 connector pipe screens (CPS), installing 63 CPS, and 8 automatic retractable screens (ARS) and installing 2 deflector screens at four sites located in the unincorporated area of North Richmond, San Pablo, El Sobrante, Montalvin, Rodeo, Crockett, Pacheco, and Bay Point. Project will work on 115 catch basins in total, and includes cleaning debris from catch basins, and preparing a photo inventory of each installation.
GFE (click to expand/collapse)
Name Size
CCC_GFE_4167 1.3 MB
Proposal & Contract (click to expand/collapse)
Name Size
CCC_PC_4167 713.8 KB
Special Provisions (click to expand/collapse)
Name Size
CCC_SP_4167 3.3 MB