CCRMC Cart Wash Upgrade

The project includes the removal of an existing cart washer and installing a new cart washer in the hospital’s SPD. There is also the installation of a new DI water system and air compressor in the boiler room and stairwell. Work includes but is not necessarily limited to demolition and removal of the old cart washer, modifying the existing building structure to accommodate the new cart washer, installing the new cart washer, installing the new DI water system, installing a new air compressor, and other minor modifications as shown in the drawings titled “CCRMC Cart Wash Upgrade, 2500 Alhambra Avenue, Martinez, CA 94553 – HCAI Backcheck Response 05/12/2023” and “CCRMC Cart Wash Upgrade, 2500 Alhambra Avenue, Martinez, CA 94553 – Change Order CO-01 / ACD0001 12/20/2024” by Ratcliff. The contractor shall also procure the new cart washer, DI water system, and any associated parts and pieces for both pieces of equipment. Furthermore, the contractor shall adhere to instructions provided by the hospital’s Infection Control Risk Assessment (ICRA) department.
Addendum 1 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
1227 Cart Washer Vented Floor Mounted Equipment Drawing 460.0 KB
12007D1-IPT 1.9 MB
A-002_4-8-25 354.6 KB
A-402_4-8-25 307.6 KB
Cart Washer Addendum 1 - FINAL 259.9 KB
Addendum 2 (click to expand/collapse)
Name Size
Cart Washer Addendum 2 167.5 KB
Addendum 3 (click to expand/collapse)
Name Size
Cart Washer Addendum 3 239.6 KB