Pinole Library Building System Upgrades
The project includes one building with a total of 15,245 SF to demolish and replace several building systems. The existing heating, ventilation, and air conditioning (HVAC) system will be demolished and replaced with a new all-electric HVAC system. The roofing system will include a full replacement of the built up roof and the metal standing seam roof. The electrical system will replace the existing electrical switchboard with a 1000A main switchboard, retrofit or new light fixtures with energy efficient light emitting diode (LED) bulbs, and power outlets on the main library floor for public use. In addition, the project accessibility improvements includes accessible parking re-location, path of travel improvements from the parking lot to the main entrance, public restroom upgrades as shown in the drawings entitled “Pinole Library Accessibility Upgrades, Pinole Library HVAC Replacement, Pinole Library Electrical Upgrade, and Pinole Library Roof Replacement.” Contractor shall be responsible for procurement of all equipment and materials.
Addendum 1
(click to expand/collapse)

Name | Size | |||
Addendum#1 Pre Bid Clarifications 2025 04 09 | 265.7 KB | |||
A Pinole Library Bid Schedule Rev 1 2025 04 09 | 66.1 KB | |||
B Pre Bid Meeting Bidder Sign In Sheet 2025 04 02 | 102.5 KB | |||
C Pre Bid Meeting Bidder Sign In Sheet 2025 04 08 | 201.8 KB |