Saranap Trash Capture Installation
General work description: The work to be done generally consists of installing a prefabricated Debris Separating Baffle Box (DSBB) on Flora Avenue in the Saranap area. Work includes temporary water diversion and dewatering, roadway and structure excavation, temporary shoring, installation of DSBB unit, and reconstruction of roadway.
GFE
(click to expand/collapse)

Name | Size | |||
CCC_GFE_7080 | 1.3 MB |
Proposal & Contract
(click to expand/collapse)

Name | Size | ||
CCC_4080_PC | 543.2 KB |
Special Provisions
(click to expand/collapse)

Name | Size | ||
CCC_4080_SP | 8.9 MB |