Fire Station 2 and 81 Generator Replacements
The project includes the removal and replacement of the existing emergency backup generators. Includes the modification of existing equipment pad, electrical conductors and miscellaneous site work. Procurement of Bay Area Air Quality Permits also required.
GFE
(click to expand/collapse)

Name | Size | ||
GFEDocBooklet - 2017-12-19 | 1.4 MB |
Specifications
(click to expand/collapse)

Name | Size | ||
Division A- Notice to Contractors | 307.0 KB | ||
Division C | 305.2 KB | ||
Fire Station 2 - Generator Replacment - Addendum 1 | 1.0 MB | ||
Fire Station 81 - Generator Replacment - Addendum 1 | 2.0 MB | ||
FS 2 - Calculations | 11.0 MB | ||
FS 2 - Equipment List | 1.4 MB | ||
FS 81 - Calculations | 8.4 MB | ||
FS 81 - Equipment List | 1.9 MB | ||
General Specifications | 3.0 MB |