Marsh Creek Bridge Replacement
The work to be done generally consists of the replacement of two existing bridges with single span concrete PC/PS wide-flange girder bridges and reconstruction and realignment of the approach roads to each bridge, located along Marsh Creek Road, approximately 4 miles apart, in Contra Costa County southeast of Clayton, site 1, and in Contra Costa County southwest of Brentwood, site 2. The reinforced concrete bridges abutments are supported with CIDH concrete piles. Work includes clearing and grubbing activities, tree removal, grading, bridge removal and single stage bridge construction, roadway construction in stages, construction of drainage facilities, storm drainage pipes and outfalls, the relocation of above ground and underground utilities, and pavement delineation.
Bid Documents
(click to expand/collapse)
Name | Size | ||
CCC_NTB_4083 | 211.7 KB | ||
CCC_PC_4083 | 620.3 KB | ||
CCC_SP_4083 | 27.8 MB |
DBE
(click to expand/collapse)
Name | Size | |||
CCC_DBE_4083 | 1.2 MB |
Informational Handout
(click to expand/collapse)
Name | Size | |||
Bridge Hydraulic Study Report 28C0519 Feb 2021 | 9.1 MB | |||
Bridge Hydraulic Study Report 28C0520 Feb 2021 | 6.6 MB | |||
Bridge Inspection Report 28C0143 2020 | 5.1 MB | |||
Bridge Inspection Report 28C0145 2020 | 4.9 MB | |||
Design Cross Sections | 6.4 MB | |||
Draft Structural Elements Assessment Report | 13.7 MB | |||
Foundation Report_Bridge 519_5-19-22 | 20.5 MB | |||
Foundation Report_Bridge 520_3-18-21 | 15.2 MB | |||
Initial Site Assessment | 10.0 MB | |||
Marsh Creek As-Built Dwgs 143 | 3.7 MB | |||
Marsh Creek As-Built Dwgs 145 | 1.5 MB | |||
Natural Environment Study | 69.9 MB | |||
Stormwater Control Plan_Marsh Creek Brdg | 1.8 MB |