Pleasant Hill Road Bridge Over Taylor Blvd. Preventative Maintenance Project

General work description: The project generally consists of preventative maintenance on the Pleasant Hill Road Bridge over Taylor Boulevard. Work to be done includes but is not limited to placing a polyester concrete overlay on the bridge deck, adding limited slope paving under the bridge, patching spalls on the bridge girders, patching spalls on various bridge substructure locations, replacing approach guardrails, pavement replacement, slurry sealing, and approach roadway striping.
Plans (click to expand/collapse)
Name Size
CCC_Full Plans_4086.pdf 7.0 MB