Pleasant Hill Road Bridge Over Taylor Blvd. Preventative Maintenance Project
General work description: The project generally consists of preventative maintenance on the Pleasant Hill Road Bridge over Taylor Boulevard. Work to be done includes but is not limited to placing a polyester concrete overlay on the bridge deck, adding limited slope paving under the bridge, patching spalls on the bridge girders, patching spalls on various bridge substructure locations, replacing approach guardrails, pavement replacement, slurry sealing, and approach roadway striping.
DBE
(click to expand/collapse)
Name | Size | |||
CCC_DBE_4086 | 1.1 MB |
Proposal & Contract
(click to expand/collapse)
Name | Size | ||
CCC_PC_4086.pdf | 752.9 KB |
Reference Documents
(click to expand/collapse)
Name | Size | |||
1 - Geotechnical Engineering Data Report | 11.4 MB | |||
2 - EBMUD Exhibits | 2.6 MB | |||
3 - Inspection Reports (28C0154) | 30.3 MB | |||
4 - As-Builts (28C0154) | 15.0 MB | |||
5 - Revised Load Rating Calculations | 2.8 MB |
Special Provisions
(click to expand/collapse)
Name | Size | ||
CCC_SP_4086.pdf | 7.1 MB |