Walden Green 1 and 2 Landscape Improvements
Landscape renovations along the Iron Horse Trail Corridor between the Treat Boulevard pedestrian bridge and Mayhew Way, including: replacement of high water use turf areas in Walden 1 with new plantings, decomposed granite picnic and seating areas; replacement of central meadow area in Walden 2 with a variety of mulch and stone hardscape; removal of dead and dying vegetation; installation of drought tolerant plantings; trimming and mulching of existing vegetation to remain; renovation of existing irrigation systems; installation of benches, trash and recycling cans.
Addendum 1
(click to expand/collapse)

Name | Size | |||
Walden Addendum 1 | 90.0 KB |
Addendum 2
(click to expand/collapse)

Name | Size | |||
Walden Addendum 2 | 86.9 KB |