Walden Green 1 and 2 Landscape Improvements
Landscape renovations along the Iron Horse Trail Corridor between the Treat Boulevard pedestrian bridge and Mayhew Way, including: replacement of high water use turf areas in Walden 1 with new plantings, decomposed granite picnic and seating areas; replacement of central meadow area in Walden 2 with a variety of mulch and stone hardscape; removal of dead and dying vegetation; installation of drought tolerant plantings; trimming and mulching of existing vegetation to remain; renovation of existing irrigation systems; installation of benches, trash and recycling cans.
Plans
(click to expand/collapse)

Name | Size | ||
Walden Green I & II_Final for Construction_8-27-20 | 32.1 MB |
Reference Documents
(click to expand/collapse)

Name | Size | |||
GFE Booklet | 1.4 MB | |||
Walden 1 North 2003-09-10 | 16.1 MB | |||
Walden 2 Remedial Action Completion Report | 12.3 MB | |||
Walden I 2011-06-30 | 125.9 MB | |||
Walden II Plans and As-builts | 236.4 MB |